
What we did
Stripped right back, which is what you do when the existing coat has debonded over most of the wall rather than in patches. You can hear it: a hollow note under the hammer means it has let go whatever it looks like.
Once it was back to sound render the whole elevation was re-dashed in white, with anthracite gutters to finish.
Before and after
Drag to see the before


Stripped back to bare render, then fully re-dashed. Drag the handle to see the before.
Every shot
All the photographs of this job
More exterior jobs


Brick to white dash with charcoal corner pillars
Roughcasting and dry dash, New build and extension render
See this job
Painted brick and old roughcast taken to white and black dash
Roughcasting and dry dash
See this jobGet in touch
Want something like this doing?
Tell us what the wall or the room looks like now and we will come back to you with a price and a straight answer about what it needs.
Call us for your instant, no obligation quote
07501 844432
